PermitsWiseIndependent NJ permit help

Edison, NJ New Home Permit: what you need, forms and fees

  • Do you need a permit? Yes.
  • Permits in order: Zoning.
  • Fee: $500 (New single-family dwelling); $500 (Zoning).
  • Office phone: (732) 248-7256.

Free: official forms and an online fill preview. $29 one time per project for clean filled forms plus your full package. Edison forms page (opens official site in new tab)

Step by step

  1. Check zoning rules for your lot before you draw plans.
  2. Gather what to bring: 5 items listed below.
  3. Fill out the Zoning application (official form linked above).
  4. Submit your application to Edison Township Zoning Office (Division of Planning and Zoning) ((732) 248-7256).
  5. Pay the fee: $500 for New single-family dwelling.
  6. Wait for approval. Do not start work until the permit is issued.
  7. Schedule inspections: Inspections Mon-Fri 9 AM - 3:00 PM; inspectors must have 24 hours advance notice; Construction Office 732-248-7257.
  8. Pass the final inspection and keep your approved permit with your house records.

What to bring

  • Completed Zoning Permit application signed by BOTH applicant and property owner
  • 3 copies of property survey/key map drawn to scale showing existing conditions and all proposed work with dimensions
  • 3 copies of construction drawings matching the survey (2 stamped copies returned for building department)
  • Residential: Floor Area Ratio (FAR) Certification Sheet signed and sealed by NJ licensed engineer/architect
  • If applicable: Zoning/Planning Board resolutions, final compliance letters, engineering reports, outside agency approvals (e.g., Freehold Soil, MCPB)

Office

Name
Edison Township Zoning Office (Division of Planning and Zoning)
Address
Unknown (not in our sources)
Phone
(732) 248-7256
Email
Unknown (not in our sources)
Hours
Mon-Fri 8:00 AM-4:30 PM

Last checked October 24, 2026. Official source (opens official site in new tab)

Researched from official Edison sources Last checked October 24, 2026. Not yet reviewed line by line by PermitsWise staff.

All Edison permit guides

FAQ

Do I need a permit for a new home in Edison?

Yes. See zoning residential requirements; FAR certification signed and sealed required.

How much is the new home permit fee in Edison?

New single-family dwelling: $500 (Payment due at time of receipt of application; check, money order or credit card.). Zoning: $500 (Zoning Application sheet). Zoning fee per Edison Zoning Application/Requirements sheet; payment due at time of receipt of application (check, money order, Visa or Mastercard; no cash)..

What should I bring for a Edison new home permit?

Completed Zoning Permit application signed by BOTH applicant and property owner; 3 copies of property survey/key map drawn to scale showing existing conditions and all proposed work with dimensions; 3 copies of construction drawings matching the survey (2 stamped copies returned for building department); Residential: Floor Area Ratio (FAR) Certification Sheet signed and sealed by NJ licensed engineer/architect.

Who do I contact about a new home permit in Edison?

Edison Township Zoning Office (Division of Planning and Zoning). Address: unknown (not in our sources). Phone: (732) 248-7256. Email: unknown (not in our sources).

PermitsWise is an independent service, not affiliated with Edison. Confirm details with the office.